Installation

 

Pick the perfect location 

Find a spot with lots of wind and no obstacles in the immediate surroundings.

 

 

 

 

Prepare location

Concrete 1.20m diameter, 25cm deep. Pull cable and put 3 pins ready.

 

 

 

Install base

With 3 pair of screws the base is fixed in a couple of minutes.

 

 

 

 

Place the generator

Hang the generator form the foot easily and without risk.

 

 

 

 

Montage of the tree

Place the root on the tree while its down.

 

 

 

 

Put up Eolie

With our little help anyone can lift up Eolie in a matter of seconds.

Et voila! All done! Start enjoying!